> Products and Solutions > Case Study

葡京娱乐网址

Zhengzhou Line 2

Casco’s first metro project in Central China

The first line equipped with CBTC based on LTE-M multiple-service communication when commissioned

Wuhan Line 6

The first operational CBTC line with 4G LTE communication technology
around the world

Shenzhen Line 11

CBTC signaling solution via 2.4G free wireless

Top operation speed of 120kph, the fastest in China

Shanghai Line 17

The first metro line with integrated CBTC signaling equipment provided
by local company in Shanghai

Beijing Line 1 Renovation

The first subway in New China

Average daily passenger flow of 1.3 million

The largest signaling renovation project in China at present

Beijing Line 2

The first CBTC system commissioned successfully in China

The first signaling system renovation line in China

The densest operating line in China currently: 110s

Beijing Airport Link

The first driverless metro line with man on duty

Shanghai Line 10

The first full automatic line with dense and heavy passenger flow

Equipped with driverless function with no man on duty

新浦京棋牌

Shanghai Line 16

The first high-speed line

The first line with fast and slow vehicles

The longest CBTC+ATO miles with one-time commission

Shenzhen Line 2

CBTC full function commissioned by 19 months

Set the time record of signaling construction

Interconnection with Shenzhen Line 5 reserved

新葡京娱乐场提款

Wuhan Line 2

The first line that traverses Yangtze River in China

Kunming Line 1& 2 (Phase I)

The first line on the plateau in China

Ethiopia Addis Ababa LRT

The first urban rail line in Ethiopia even East Africa

The first urban transit project undertook by Chinese company in Africa

< 新浦京棋牌 >
新葡京娱乐场提款
葡京娱乐网址